All projects
Te Puke packhouse mezzanine
Te Puke · 2024
Access steel threaded through a running packhouse, installed at night.
A 600sqm mezzanine over the grading floor of a kiwifruit packhouse, in a building that runs twenty hours a day in season.
We fabricated it in bolt-together modules small enough to come through the roller door on a forklift, and installed between 1am and 5am across nine nights.
The line started on time every morning of the install.