Te Puke packhouse mezzanine
All projects

Te Puke packhouse mezzanine

Te Puke · 2024

Access steel threaded through a running packhouse, installed at night.

A 600sqm mezzanine over the grading floor of a kiwifruit packhouse, in a building that runs twenty hours a day in season. We fabricated it in bolt-together modules small enough to come through the roller door on a forklift, and installed between 1am and 5am across nine nights. The line started on time every morning of the install.